The Kiewit Haystack Feasibility Study is a two part project. The first part investigated the cost of taking "Run of Mine" coal and crushing, conveying, storing, & loading it into trucks. R&M Engineering performed the preliminary layout, structural design, & obtained bids from various equipment manufacturers. The Second Phase of the project investigated unloading from trucks, conveying, storing in (2) 9,000 ton silos, and an automatic batch loading system to rail.


Services Provided:

  • Facility Layout
  • Truck and Rail Loading
  • Project Cost Estimate
  • Prelim. Steel Structure Design
  • Prelim. Concrete Foundation Design